$76.8M to Delete One Left Turn

The Keating overpass came in at a reported $76.8 million and removed the at-grade crossing of the highway. Cost per deleted turn is not a recognized accounting method. The plaque uses it anyway.

Weatherproof vinyl · $2 shipping in Canada · designed in Victoria

THE ACTUAL SITUATION

The turn across the highway is gone. In its place is a concrete ramp that carries you up, over and back down to reach the same side road you were already looking at.